kadenceclay26
kadenceclay26 kadenceclay26
  • 03-10-2016
  • Mathematics
contestada

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

Mandy is asked to find the probability of rolling a 3 on a die and drawing an ace of spades from a deck of cards. This is a compound event. A. True B. False
please help me with this question
What is the functional advantage of the alveolar walls being so thin?
Which sentence uses the word abysmal correctly
How many healthy babies have been born thanks to genetic testing?
A. AB B. AC and BC C. AC D. E. BC F.
_________ invested in barrels and warehouses to store oil. A. Cornelius Vanderbilt B. Andrew Carnegie C. Henry Clay Frick D. John D. Rockefeller
A can company makes a cylindrical can that has a radius of 6 cm and a height of 10 cm. One of the company’s clients needs a cylindrical can that has the same vo
A mound of dirt sits next to a hole that is 8 feet deep by 8 feet wide by 8 feet long. If the dirt was dug out to make the hole, how much dirt is in the pile?
A cellular company has 851 customers. The company has sold 534 talk and text plans, and they have sold 768 talk plans. What is the probability that a customer h