if 5 workers can build 5 cars in 5 days how many days would it take for 7 workers to build 7 cars

Respuesta :

1uk846 1uk846
  • 01-03-2021

Answer:

7 days

Step-by-step explanation:

It would also take 7 days

Answer Link

Otras preguntas

Slope line passing (-4,-7) and (-2,-3)
Which Stax artist wrote many of his hit songs, including "Respect," which was later recorded by Aretha Franklin
What role did Lincoln's Emancipation Proclamation play in shaping the Union's attitudes toward the Civil War? It led some abolitionists in the North to switch
find roots of equation. 16x^2+16=0
which. nursing action is essential before administering an opioid to a patient? 1) pulse 2) respiration 3) blood pressure 4) temperature in quizlist
Solve the absolute value equation |2x - 4| = 10. Select two answers from the choices below. a. x = 7 b. x = -3 c. x = 2 d. x = -6
1. Phionah poured 100cm³ of water. Phionah later mixed 400cm³ of salt solution of density 1.6gcm3 in the water above. Determine the density of the mixture​
The interior angle of a regular polygon is 19 times the size of the exterior angle. calculate the size of the interior angle and the number of sides the polygon
PLEASE HELP! HOW DO YOU SOLVE THIS?
54321 code in english language​