hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

Need your help now please; the assignment is due tonight and this is the last problem I am having trouble with. The red box is the value I keep getting wrong Th
How many different sequences of 3 playing cards (from a single 52-card deck) exist? 22,100 140,608 132,600 24,804
Drag each label to the correct location on the diagram. Label the parts of the brain.
A right rectangular pyramid is sliced horizontally (across) at the red line by a plane parallel to the base. What is the shape of the cross-section?
What are the three techniques scientists can use for correlation ? (fossils)
How do the words forged and nurtured affect the meaning of this passage
the monthly salary of a married couple is rs 405000plua a festival expenses of 30000calculate the income tax paid by the couple in a year​
Write the equation of the graph of y = cos(x) was shifted downwards by 3 units, shrink horizontally by a fourth of a unit, inverted horizontally and shifted 60°
how to determine area of the following,in some cases leave the answer in term of x ABJH​
Read the following passage from "A Way of Talking." I was so wild with Rose. I was wild. I was determined to blow her up about what she had done, I was determin